Artisan Environmental was invited to undertake the Asbestos Survey at Hilsea Lido prior to the proposed redevelopment works.
SCOPE OF WORKS
Pre-start site visit
Desktop site review
Full site-specific risk assessment
Site wide detailed survey
Fully compliant sampling, analysis and detailed report
Follow up overview meeting.
CHALLENGES
Derelict building sections
Working conditions included the need to avoid stagnant standing water and inspection within a redundant plant room with difficult access
High profile location – Hilsea Lido is a
much loved part of Portsmouth heritage and its regeneration will provide a great attraction.
HOW WE MADE A DIFFERENCE
Provision of ongoing project support.